For this data centre, Metrowest completed the following:
- Install and commission of four 22kV/2.5 MVA Diesel Rotatory UPS units
- Procurement and installation of 45 tier 22kV switchboard
- Installation of eight 22kV/2.5MVA dry type transformers
- Plant room mechanical design, installation and commission
- Above ground automated diesel fuel system with 180,000 Ltr storage
- System commissioning and load testing
Value: $12 million