35m Monopole, Cannington Central WA

Metrowest was engaged by Service Stream to complete the following: • Mass concrete pad foundation installation • Monopole and headframe installation • Compound finish Client: Service Stream Timeframe: 4 weeks

35m Monopole Upgrade, Eaton WA

Metrowest was engaged by Indara to complete the following: • Foundation upgrade • Structural steel strengthening installation Client: Indara Timeframe: 4 weeks

25m Lattice Tower Upgrade, Cheyne Beach WA

Metrowest was engaged by Fulton Hogan to complete the following: • Assemble 25m of Tower on site • Remove 25m Top Section of Tower and replace with new section • Reinstate Existing Microwave Dishes • Sand Blast Bottom 10m of Tower • Paint 10m of tower according to clients specifications. Dispose of 25m TowerClient: Fulton…

Metrowest was engaged by Indara to complete the following: • Stakeholder coordination • Foundation upgrade • Shelter AC upgrade • Tower decommission, pole and headframe installation same day • Compound fencing installation Client: Indara Timeframe: 4 weeks

Metrowest was engaged by Indara to complete the following: • Design, Supply and Install 80m guyed mast and headframe • Foundation and compound works • Installation of 900m mains power run Client: Indara Timeframe: 6 weeks

Metrowest was engaged by DFES to complete the following: • Design, Supply and Install 60m guyed mast • Foundation and compound works • Mains power installation and commissioning • Microwave antenna installation and commissioning Client: DFES Timeframe: 6 weeks

On behalf of Motorola, Metrowest completed the following: Microwave parabolic antenna and feeder cable installation and commissioning Tower structural strengthening Antenna mount installation Client: Motorola Timeframe: 6 months

For this project, Metrowest completed the following: Antenna and headframe installation BTS and filter/combiner configuration upgrade and commission Eltek DC Systems installation and commissioning Miscellaneous Fibre rack installation and commissioning Air-conditioning – exhaust fan retro installation Client: VHA Timeframe: 3 weeks

For this project, Metrowest undertook and completed the following works: Civil monopole foundation and compound works Site compound fencing Site shelter installation Mains Power installation and commissioning Eltek DC Systems Installation and commissioning BTS – ODU installation and commissioning Monopole assembly and build Fibre installation and commissioning Antenna, feeder cable installation, test, and commissioning Client:…

Metrowest was engaged by Telstra to complete the following: Civil mast and guy foundation, including compound works Mains power and Eltek DC systems installation and commissioning Mast assembly and build ODU installation and commissioning and fibre and feeder cable installation, test, and commissioning Client: Telstra Timeframe: 8 weeks